Engineering Datasheet: THM Battery Clip, Direct Footprint Replacement for Keystone 89
Securing heavy D cylindrical cells on FR4 boards demands massive retention force. Wave soldering large components requires absolute THM pin coplanarity. The Jiatel JT-BC-D-KS89 is a direct footprint replacement for Keystone 89. This clip features a heavy-duty U-channel gripping architecture. It utilizes dual downward solder tails. You can execute seamless board-level power integration. You do not need to alter existing PCB drill hole coordinates.
Verified Board-Level Parameters
| Target Cross-Reference | Direct Footprint Replacement for Keystone 89 |
| Mounting Architecture | Through-Hole Mount (THM) Dual Pin |
| Axial Pin Pitch | 11.10mm Spread (Requires Ø2.50mm Drills) |
| Component Layout Pitch | 30.20mm Between Clips (Standard D Cell) |
| Base Metallurgy | T=0.50mm Spring Steel | Nickel Plated |
Target Deployments
- Industrial Equipment: Heavy-duty PCB-mounted power backup modules.
- Security Systems: Large standalone alarm enclosures requiring D cell power.
- Consumer Electronics: High-drain devices needing robust THM stability.
Metallurgical Rigidity & Solder Joint Integrity
We stamp the JT-BC-D-KS89 from thick T=0.50mm Spring Steel. This specific formulation guarantees absolute structural rigidity for heavy cells. The 29.87mm high gripping arms prevent cell dislodgement during mechanical shock. The clip will not yield under repeated D cell insertion cycles. We finish the assembly with high-density Nickel Plating. This maximizes wave solder wettability on the robust THM pins. It eliminates the risk of cold solder joints.
NPI PCB Footprint Audit & SLA Directive
Board-level integration of heavy clips demands strict adherence to drill dimensions. Layout errors cause THM misalignment and wave soldering failures. Our engineering rules strictly prohibit the distribution of unverified digital mockups. We execute structural footprint validation exclusively through official [Technical Datasheets]. We rely on dimensionally controlled [2D Footprint Specs].
Confirm that our THM clip matches your existing FR4 land pattern. Submit your board constraints directly to our technical desk: NPI Engineering Queue. We will dispatch matched, production-ready PDF drawings within 12 working hours.







