Engineering Datasheet: SMT Coin Cell Retainer, Direct Footprint Replacement for Keystone 2996
Securing thick coin cells on FR4 boards requires robust SMT pads. The Jiatel JT-BC-LR44-KS2996 is a direct footprint replacement for Keystone 2996. This micro retainer allows hardware engineers to execute seamless board-level integration. You do not need to alter existing PCB pad layouts. You can keep your current reflow solder stencil designs.
Verified Board-Level Parameters
| Target Cross-Reference | Direct Footprint Replacement for Keystone 2996 |
| Mounting Architecture | Surface Mount Technology (SMT) |
| Outer Pad Span | 17.78mm Minimum Span |
| Negative Pad Constraint | 4.00mm Square Minimum |
| Base Metallurgy | T=0.25mm Phosphor Bronze | Nickel Plated |
Target Deployments
- Medical Diagnostics: Portable glucose monitors and hearing aids.
- Consumer Electronics: Compact laser pointers and small handheld tools.
- Industrial IoT: Miniaturized RTC backup power nodes.
Metallurgical Rigidity & Solder Joint Integrity
We stamp the JT-BC-LR44-KS2996 from rigid T=0.25mm Phosphor Bronze. This specific material provides excellent fatigue resistance. The top clamping arms will not yield under constant battery pressure. We finish the entire assembly with high-density Nickel Plating. This plating maximizes solder paste wettability during the SMT reflow process. It eliminates the risk of cold solder joints.
NPI PCB Footprint Audit & SLA Directive
Board-level assembly demands strict adherence to pad dimensions. Layout errors cause reflow misalignment and battery seating failures. Our engineering rules strictly prohibit using unverified digital mockups. We execute footprint validation exclusively through official [Technical Datasheets]. We also rely on dimensionally controlled [2D Footprint Specs].
Please confirm that our SMT retainer matches your land pattern needs. Engage our Senior NPI Engineering Team for layout verification. Submit your board constraints directly to our technical desk: NPI Engineering Queue. We will dispatch matched, production-ready PDF drawings within 12 working hours.





